Five ways to teach you perfect installation 4mm SPC Wooden Flooring
1. To install 4mm SPC Wooden Flooring, you must first drill holes on the wall to prepare for the installation of skirting.
2. Before laying the moisture-proof layer, remember to clean the ground and ensure that the ground is dry. The two moisture-proof layers should be sealed with tape to ensure the sealing effect.
3. Start laying 4mm SPC Wooden Flooring. Compared with solid wood flooring, laying is relatively simple, because it is a standardized product, you don't have to worry about color difference, because the quality is stable, you don't need to consider the gap of the floor.
4. The floor and skirting have been installed, but the whole installation is not completely over. Since no furniture came in when installing the floor, the responsible team would remove the packaging box and lay it on the installed 4mm SPC Wooden Flooring. To prevent wear and tear.
5. Install the skirting and fix the skirting line. The purpose of the skirting is to block the ugly gap between the floor and the wall. In order to achieve a coordinated decorative effect, the skirting line can be selected according to the color of the door cover or the color of the floor.